Planning tool
Developer land workplan
The order of work from screening a site to closing on it
This workplan sets out the order of work a developer follows from screening a site to closing on it: site control, title, survey, environmental and geotechnical studies, utilities, access, approvals, fees and financing. Each step says who to ask and what to request. It is a process guide, not legal or engineering advice.
In short: A developer workplan from site screening to closing: title, survey, environmental and geotechnical studies, utilities, access, approvals and financing.
A process guide, not legal, engineering, tax or insurance advice.
Which items apply to you?
Screen and control the site
-
Flood zone, wetlands, soil, slope, drainage and land cover narrow which sites deserve diligence money.
-
A contract or option needs a diligence period long enough to finish the studies below, and a right to leave if one fails.
-
Easements, covenants, liens, mineral and access rights can each change what is possible.
-
Boundaries, easements, topography and encroachments set the design envelope. For lender and title use, ask which survey standard is required.
Diligence
-
A Phase I shows past uses and recognized environmental conditions. A standard recognized under EPA’s All Appropriate Inquiries rule matters for liability protection, so ask the consultant and your attorney.
-
Soil conditions drive foundation type, grading cost and whether the plan holds.
-
Wetlands, streams and protected species can limit developable area and add federal and state steps.
-
Mapped flood hazard areas and the way water leaves the site decide lot yield and stormwater design.
-
Capacity and extension cost for water, sewer, power, gas and telecom can decide the project.
-
The site needs approved access, and a project of size may need a traffic study or road improvements.
-
Shoreline buffers, docks and seawalls can need separate approvals that run on their own clocks.
Florida oceanfront due diligence Tennessee acreage due-diligence guide
Entitlement and approvals
-
Planning staff can say which approvals your plan needs and in what order.
-
Rezoning, subdivision plat, site plan and planned development each have their own steps, hearings and timelines. Plan around the office’s published calendar.
-
Fees and bonds due at plat or permit can change the pro forma.
Financing and closing
-
Appraisal, environmental, geotechnical, survey, entitlement status and entity documents are common conditions.
-
The diligence period, extensions, approvals and closing date have dates that cost money if missed.
-
Permits, bonds, erosion control, contractor selection and insurance each need lead time.
How should you use this checklist?
- Treat each “Ask” as a real person. A licensed professional or an office decides each question. The checklist only tells you whom to ask and what to request.
- Get answers in writing. A letter, a permit, a report or a recorded document is evidence. A phone answer is not.
- Read the public-source readings first. Run the address lookup to see flood zone, wetlands, soil, elevation, slope, drainage and land cover for a site. Each reading is context at one point, not a determination.
- Run the numbers. The development pro forma worksheet adds up the costs from figures you type.
- Plan the funding. The draw schedule worksheet shows how equity and a loan would fund costs month by month, from figures you type.
- Rules change. Sources were read October 18, 2026. Confirm the current rule with the named office or your attorney.
More checklists are on the planning tools page.
Developer land workplan: frequently asked questions
Is this a complete development plan?
No. It covers land due diligence and the approval path. Design, construction, marketing and sales are separate work with their own professionals.
Why does it say to ask the consultant and attorney about the environmental standard?
Liability protection can depend on the environmental assessment meeting the standard in force. A consultant and an attorney confirm what applies to your deal.
Is anything I tick saved or sent to ABODE?
No. The list runs in your browser. Ticks and choices are not saved, sent or logged. Use Copy as text or Print to keep your own copy.
Ask an advisor about your situation
An ABODE advisor replies privately. We aim to reply within one business day.
Sources and notes