Williamson County
County-wide property tax by city and school-tax district, unincorporated zoning, septic and greenbelt
Tennessee · Acreage and estate checklist
What a buyer or seller of acreage or an estate in Tennessee can verify about access, utilities, restrictions and intended use, and which office controls each item
Before closing on Tennessee acreage, verify the septic evaluation and permit, water source, legal access, subdivision and zoning status, Greenbelt and property tax records, flood and stream rules, any TVA shoreline rights, and what title and survey show. Different offices control each item. This guide names them and the document to request from each.
In short: Tennessee acreage buyers and sellers verify septic, access, subdivision, zoning, Greenbelt, easement, flood and TVA items, and a different office controls each one.
A reference guide, not legal, tax, insurance or engineering advice. Updated October 2026.
Most acreage questions are decided by an office outside the sales contract. This table names the office the sources identify and what that office says.
| Item | Who controls it | What the sources say | Source |
|---|---|---|---|
| Septic (subsurface sewage disposal) | TDEC (its permit page sends applications to the Division of Water Resources) statewide; in Williamson County, Tennessee, the county Department of Sewage Disposal Management | TDEC’s FAQ says a septic system permit is required for construction, modification or repair, and a TDEC Environmental Scientist conducts the site evaluation. Williamson County’s regulations define a construction permit as a written authorization issued by its Department | Notes 1, 2, 7 |
| Private well | The state licenses drillers; the owner is responsible for testing | TDEC says Tennessee has no sampling or analysis requirements for private water supplies and strongly recommends annual bacteria testing | Note 3 |
| Public water or sewer | The utility serving the address | Williamson County’s subdivision regulations say applications include proof of the availability of potable water and proper treatment and disposal of wastewater. Ask the utility for a written statement for the specific parcel | Note 6 |
| Legal access and easements | Recorded documents and title work; a court if a landlocked owner petitions | A Tennessee statute provides a condemnation process for an owner cut off from a public road, with exceptions | Note 4 |
| Dividing the land | The planning commission, then the Register of Deeds records the plat | Outside a municipality, a plat generally cannot be recorded without regional planning commission approval where the statute’s road-plan condition is met, with limited exceptions | Notes 5, 6 |
| Zoning and agricultural use | County planning for unincorporated land; the city for land inside a city | A state statute exempts land used for agricultural purposes from county zoning if structures are incidental to the agricultural use, with listed exceptions | Notes 5, 6, 8 |
| Greenbelt classification and rollback tax | The county assessor; the State Board of Equalization approves the forms | Qualifying land is valued at its present use. Rollback taxes recapture the savings for the prior three years (agricultural and forest) or five years (open space) | Notes 9, 10 |
| Conservation easements | Recorded in the county register’s office; held by a public body or a charitable entity; the Land Trust for Tennessee is one holder | The Conservation Easement Act of 1981 defines the easement as a recorded interest imposing limits on the owner. One land trust says its easements permanently limit development and subdivision and bind future owners | Note 16 |
| Streams and wetlands | TDEC (Aquatic Resource Alteration Permit) and the U.S. Army Corps of Engineers | TDEC says physical alterations to waters of the state require an Aquatic Resource Alteration Permit; a federal permit may also be required | Note 12 |
| Floodplain | The local floodplain administrator; FEMA publishes the maps | The State NFIP Office does not keep elevation certificates; copies come from the local floodplain administrator | Note 14 |
| TVA shoreline | Tennessee Valley Authority | TVA says it owns land or land rights along most reservoir shoreline, that permits do not automatically transfer with the property, and that buyers and sellers should confirm all shoreline construction was approved by TVA | Note 13 |
| Property tax | The county assessor appraises; county trustees and city collecting officials collect | The Department of Revenue says it does not collect property tax | Note 15 |
| Survey, title and deed restrictions | A licensed surveyor, a title company and your attorney | We did not find a Tennessee agency page that explains what a survey shows versus what title insurance covers. Ask your attorney | Not sourced |
This is a map of who to ask, not advice. Offices, forms and fees change; confirm each item with the office named.
In the sources we opened, the state agency handles septic permits. TDEC’s permit page sends applications for the subsurface sewage disposal system (SSDS) construction permit to its Division of Water Resources, and TDEC’s FAQ says “a septic system permit is required for the construction, modification or repair of a septic system.” It adds that a TDEC Environmental Scientist conducts a site evaluation to determine the type of system required and may request a soils map from a private licensed soil consultant (Note 1). The statute says anyone proposing to construct, alter, extend or repair a subsurface sewage disposal system must secure a permit from the commissioner (Note 2).
What goes into an application. TDEC’s permit page asks for the landowner, the location and size of the lot, and a sketch showing property lines, the house site, well and spring locations and planned driveway and utilities. It lists “soils maps by a soil scientist (if required)” and says a licensed engineer prepares the design for large conventional or alternative systems (Note 1). TDEC approves private soil consultants under rule 0400-48-01-.18 (Note 1).
What the permit does and does not tell you. TDEC’s permit and FAQ pages do not state how long a construction permit is valid (Note 1). The rule chapter text we read, which Justia reproduces (marked current through June 26, 2025, with a warning that it may not be the latest), says in section .06(4) that a construction permit “shall have an expiration date effective three (3) years from the date of issuance” (Note 2). We could not open the Secretary of State’s copy of the rule. Treat that as a question for TDEC, not a settled fact. For lot suitability, the same rule text (section .04) says site suitability must be demonstrated before design, looking at soil absorption rates, soil conditions, freedom from groundwater interference and topography. It calls slopes over 50 percent unsuitable and generally calls for the water table to be at least four feet below the bottom of the disposal field, with exceptions. The section text we read states no minimum lot size (Note 2). Existing systems: TDEC says records for existing septic systems can be found through its septic permit records search (Note 1).
If a county department issues the permit. Williamson County’s on-site sewage regulations, adopted by its Board of Health and shown as amended through March 18, 2025, say the county Department of Sewage Disposal Management regulates subsurface sewage disposal under state law, that the county has jurisdiction over septic installations within the county, including land inside its incorporated cities and towns, and that it is unlawful to construct, alter, extend or repair a system before obtaining a permit from the Department. They also say permits are governed by the regulations in effect on the date of issuance, and renewals by those in effect when the renewal is approved, and that a permit is not a guarantee a system will function for any period of time (Note 7). The sources we opened do not explain how county and state roles divide.
Sellers. For a sale of one-to-four-unit residential property that had a permit and a septic system installed, T.C.A. 68-221-409 (Justia copy) says the potential future obligation to connect to the public sewer system must be disclosed by the seller to the purchaser. The subsection does not say when (Note 2).
Private wells. TDEC says Tennessee licenses well drillers, pump installers and water treatment installers, and that drillers must file a Water Well Drillers Report to the Division of Water Resources. The owner should request a copy, and driller reports are public record (Note 3). TDEC says the state has no requirements for sampling and analysis of private water supplies, strongly recommends annual bacteria testing, and tells owners to ask a lender or buyer which parameters they require (Note 3).
Access. Whether a parcel has a legal way in is a title question first: the deed, recorded easements and plats. Tennessee also has a statutory process. Section 54-14-102 (2025 text via Justia) lets a landowner whose land is cut off from a public road, or who has no outlet to one, seek to have an easement or right-of-way condemned for ingress, egress and utility lines, with a width limit stated in the statute. Section 54-14-119 says a court will not condemn an easement if the cut-off or obstruction results from the intentional and knowing action of the owner of the enclosed land (Note 4). We did not open any source on easements by necessity under case law, so title work and your attorney decide what applies to a specific parcel.
Subdivision. A county’s regional planning commission controls plats. The UT County Technical Assistance Service summarizes T.C.A. § 13-3-402: outside a municipality, the Register of Deeds cannot record a plat without regional planning commission approval, or planning staff approval in certain situations, in counties where the commission has filed a certified major road plan; plats of up to 25 lots with preliminary approval, or five lots without it, can be endorsed by the commission’s secretary or another designee (Note 5). A CTAS training deck on the Register of Deeds lists plats among the documents the register records and says “RPC approval required (may be delegated to staff in some circumstances)” (Note 5). Williamson County’s subdivision regulations (adopted and effective May 13, 2021, amended August 11, 2022, on the copy we read) provide minor, major traditional, conservation and large-lot easement subdivisions, and, citing T.C.A. 13-3-402, say no plat is to be received or recorded by the Register of Deeds until it has final Planning Commission approval endorsed in writing (Note 6). The county’s own web page for the regulations lists only 2015 amendments and says the web version is not a legal document and the print version controls, so ask Planning for the controlling copy (Note 6).
Minimum lot size. There is no single Tennessee minimum. Williamson County’s subdivision regulations say lot size, width, frontage and setbacks follow the zoning restrictions, lots relying solely on septic need the greater of the zoning minimum or the on-site sewage regulations’ minimum, and minor and large-lot easement subdivisions without public water must have lots in excess of five acres (Note 6). In Rutherford County, Tennessee, the zoning ordinance’s Table 1 lists a 5-acre minimum lot area in the Agricultural Residential district and 1 acre in the Low Density Residential district (Note 8).
Two county examples. Williamson County’s subdivision regulations describe a large-lot easement subdivision with a shared driveway at least 16 feet wide inside an access easement at least 50 feet wide that serves no more than five lots, and say no private road may be platted unless the Planning Commission approves it. For minor and large-lot subdivisions without public water, they require the final plat to state “Public potable water is not available for this site” and that the county bears no responsibility, in approving the plat, that a dedicated source of potable water is available (Note 6). Rutherford County’s planning FAQ describes a path for a residence on a non-subdivision lot: a copy of the septic map or permit from “TN Environmental,” then a Certificate of Zoning Compliance from Planning and Engineering, then the Building Codes Department. The FAQ lists among the certificate’s general purposes that it establishes lot size, access and legality and checks for flood issues (Note 8). This guide did not find a source explaining how the “TN Environmental” office relates to TDEC, so ask Rutherford County Planning. The Williamson County zoning ordinance took effect January 1, 2013; Rutherford County’s took effect January 1, 2013 and is shown as amended through December 11, 2025 (Notes 6, 8).
Zoning versus agricultural use. CTAS describes T.C.A. § 13-7-114 as exempting land used for agricultural purposes from the county zoning statutes if structures, including farmers’ and farm workers’ residences, are incidental to the agricultural purpose, but not where the property is near state or federal-aid highways, public airports or public parks. CTAS adds that counties in the National Flood Insurance Program are required to regulate buildings and development, including agricultural development, in special flood hazard areas to the extent needed to comply with the program (Note 5). The Williamson County zoning page says its ordinance, adopted May 14, 2012 and effective January 1, 2013, governs development in the unincorporated county (Note 6). Land inside a city follows that city’s rules, so confirm the jurisdiction before relying on a county page.
The Agricultural, Forest and Open Space Land Act of 1976, commonly called Greenbelt and cited as T.C.A. §§ 67-5-1001 et seq., values qualifying land by its present use rather than by the use that would support the highest value (Notes 9, 10). The Comptroller’s State Board of Equalization page lists these thresholds: agricultural land of at least 15 acres that is a farm unit in production or meets a 25-year farming and residence test; forest land of at least 15 acres with a forest management plan; and open space of at least three acres, which the county or municipal planning commission must first designate (Note 9). The assessor receives applications; the State Board of Equalization approves the forms and hears appeals of denied applications (Note 9).
Rollback tax. The Comptroller calls rollback taxes the taxes saved over the prior period, a recapture rather than a penalty: three years for agricultural and forest land and five for open space (Note 9). CTAS lists triggers that include land no longer qualifying, a written request to withdraw, development of land covered by a recorded subdivision plat or an unrecorded development plan, and failure to file a required application. It says the seller is liable unless a written contract provides otherwise, that a buyer who declares in writing at sale an intent to continue the classification but does not file within 90 days becomes solely responsible, and that rollback taxes are a first lien on the disqualified property (Note 10). The sources we opened state no rate, and we quote none.
Where the sources disagree. Filing dates differ. The Comptroller’s page says first-time applications are due March 15 (Note 9). The Rutherford County Assessor’s page says applications are due by March 1 in one place and March 15 in another, and that new owners of land in Greenbelt must reapply (Note 11). The Comptroller’s page says reapplication is not required unless ownership as of January 1 changes (Note 9). The Comptroller’s July 2020 handbook says an application must be filed with the assessor by March 1, and that after an ownership change a new application is due by March 1 of the following year; the handbook says its interpretations are general advice, not binding rulings, and that it has not been approved by the State Board of Equalization (Note 9). CTAS’s 90-day buyer rule above is a further timing rule (Note 10). Ask the assessor, in writing, which date applies to your closing.
Conservation easements. Tennessee’s Conservation Easement Act of 1981 (T.C.A. §§ 66-9-301 et seq.) defines, for easements granted on or after July 1, 2005, a conservation easement as “a nonpossessory interest of a holder in real property imposing limitations or affirmative obligations on the owner of the servient estate,” recorded in the register’s office of the county where the easement is located. A holder is a public body empowered to hold an interest in real property or a charitable corporation, association or trust whose purposes or powers include retaining or protecting the natural, scenic or open-space values of real property, and section 66-9-304(a), read in the American Farmland Trust copy, says an easement “shall remain severed from the fee unless returned by specific conveyance to the holder of the fee” (Note 16). The Land Trust for Tennessee, one holder, describes its easements as voluntary agreements that permanently limit how land can be developed and subdivided. It says the terms apply to all future owners, that owners keep ownership and may sell the land or transfer it to heirs, and that owners may still build under rights the easement reserves. It also says owners “may also be eligible for tax benefits” but that it cannot give legal or financial guidance (Note 16). Easements differ, so read the recorded instrument. Ask the title company whether one is recorded, and take any tax question to a tax advisor.
Property tax roles. The Comptroller says county assessors appraise property and the county commission sets the county tax rate; the Department of Revenue says it does not collect property tax and that county trustees and city collecting officials do, and the Comptroller says the State Board of Equalization provides quasi-judicial review of property tax assessments (Note 15). Request the current tax bill and the assessor’s parcel record, and check whether a city and county both tax the address.
Streams and wetlands. TDEC says “physical alterations to properties of waters of the state require an Aquatic Resource Alteration Permit (ARAP).” Its examples include digging out, widening or straightening channels, sloping or stabilizing banks, building dams, dikes or levees, flooding, draining or filling a wetland, and road and utility crossings. It says a federal permit may also be required from the U.S. Army Corps of Engineers for discharges of dredged or fill material, and that a Section 401 certification must come from the state first when a Section 404 permit is required (Note 12). The Corps’ program overview describes Section 404 as authorizing permits for the discharge of dredged or fill material into waters of the United States and Section 10 as covering construction, excavation or deposition of materials in, over or under navigable waters (Note 12). Whether a particular feature on a parcel is a regulated water is a site-specific question for TDEC, the Corps or a qualified consultant.
Floodplain. The FEMA Flood Map Service Center searches flood maps by address and notes that the map image is static and has not been updated since its effective date, so check for later map revisions (Note 14). The TEMA flood insurance page says copies of elevation certificates come from the local floodplain administrator, that the State NFIP Office does not keep them, and that a licensed Tennessee surveyor must complete the certificate for a property owner (Note 14). Rutherford County’s zoning compliance review checks for flood issues, and its zoning ordinance has a Flood Hazard Districts chapter (Note 8).
TVA shoreline. For lakefront acreage on a TVA reservoir, TVA says it owns land or land rights along most reservoir shoreline and tells buyers and sellers to ensure that all shoreline construction has been approved by TVA. It says permits do not automatically transfer with property ownership and that a new owner must apply for a Section 26a permit within 60 days of closing (Note 13). TVA describes Section 26a jurisdiction on reservoirs as typically reaching the limits of the 500-year floodplain or the upper limits of TVA flowage rights, whichever is higher, and says permission is needed before any activity on TVA land (Note 13). TVA’s Public Land Information Center is (800) 882-5263. For a local look at the reservoirs on this site, see ABODE’s Tellico Lake, Fort Loudoun Lake and Vonore pages.
Request the document, not a verbal answer. Where we found no source for a question, the row says so.
| Item | Who controls it | Document to request | Source |
|---|---|---|---|
| Septic suitability and permit | TDEC, or the Williamson County Department of Sewage Disposal Management inside Williamson County | Any existing permit and records-search result, a soils map by an approved soil consultant, the site evaluation result, and the permit’s issue date | Notes 1, 2, 7 |
| Water source | The water utility, or the owner of a private well | A written utility availability statement, or the Water Well Drillers Report and recent water test for a well | Notes 3, 6 |
| Legal access | Title work, recorded easements and plats | The vesting deed, recorded easement instruments and plat; ask your attorney about any parcel without public road frontage | Note 4 |
| Subdivision status and any split | Regional planning commission; Register of Deeds records | The recorded plat and any planning commission approval or notation for a private drive | Notes 5, 6 |
| Zoning district and permitted use | County or city planning office | A written zoning determination for the parcel, and, in Rutherford County, the Certificate of Zoning Compliance that its planning FAQ describes for a residence | Notes 6, 8 |
| Greenbelt status | County assessor | The recorded Greenbelt application, classification type, and the assessor’s written statement of any rollback exposure and the filing date for a new owner | Notes 9, 10, 11 |
| Streams and wetlands | TDEC (ARAP) and the Corps | Any prior ARAP or Corps permit, and a consultant’s site assessment if streams or wet areas appear on the parcel | Note 12 |
| Flood zone | Local floodplain administrator; FEMA maps | FEMA map result for the address, any elevation certificate, and the local administrator’s statement on development limits | Notes 8, 14 |
| TVA rights and permits (lakefront) | TVA | The Section 26a permit, a TVA statement of land rights between the parcel and the lake, and confirmation of any transfer step | Note 13 |
| Property tax record | Assessor and trustee or city collecting official | Current tax bill, assessor parcel record, and delinquency status | Note 15 |
| Recorded conservation easement | The holder (a governmental body or charitable entity) and the county register’s office | A copy of any recorded easement, the holder’s name and contact, and any monitoring or reserved-rights terms | Note 16 |
| Deed restrictions and covenants | Whoever holds the recorded rights | All recorded restrictions, easements and any road-maintenance or association documents named in the title commitment | Not sourced |
| Survey and title | Surveyor, title company, attorney | A current survey, the title commitment with exception documents, and your attorney’s review | Not sourced |
Put each question in writing and keep the answer with the contract file. The questions are our suggestions; the Source column shows the sourced fact behind a question where one exists.
| Ask | Questions to put in writing | What the answer helps confirm | Source |
|---|---|---|---|
| County or city planning office | Is the parcel inside a city or in the unincorporated county? What is its zoning district and permitted use? Was it created by a recorded, approved plat? Does it front a public road, or a private drive or access easement the Planning Commission approved? Is a split or added dwelling allowed? | Which government’s rules apply, and whether the intended use and any division are allowed. Williamson and Rutherford Counties publish different ordinances and processes | Notes 5, 6, 8 |
| Water utility (or the owner of a well) | Will you provide a written statement that water service is available to this parcel? Where does the line end, and who pays to extend it? Are new connections being accepted? For a well: is the driller’s report available, and has a lab tested the water? | Whether a public water source exists, and what a lender or buyer may ask for. Williamson County’s subdivision regulations say applications include proof of the availability of potable water | Notes 3, 6 |
| TDEC or the county sewage department | Is there a permit, site evaluation or soils map on file for the parcel? What system type was approved, when was it issued, and when does it expire? Was the soils work done by an approved soil consultant? Is public sewer expected, and would a connection be required? | Whether the lot supports a septic system and what an existing system was approved for. T.C.A. 68-221-409 (Justia copy) says the seller of qualifying residential property must disclose a potential future obligation to connect to public sewer | Notes 1, 2, 7 |
| Surveyor (licensed in Tennessee) | Does the survey show the boundary, road frontage, easements, encroachments, streams, floodplain lines, and the locations of any well, septic field and shoreline rights? Will it be certified to the buyer and lender? Can you complete an elevation certificate if one is needed? | What is physically on the ground compared with the deed and plat. TEMA says a licensed Tennessee surveyor must complete an elevation certificate for a property owner; the rest of this row is suggested | Note 14 |
| County assessor and trustee | Is the parcel in Greenbelt, and under which classification? When was the application filed, and what is the date for a new owner to file? Is there any rollback exposure? Which city or special taxing authority bills the parcel? | The tax record, any rollback exposure at sale, and the filing date for a new owner. Sources give different filing dates | Notes 9, 10, 11, 15 |
| Register of Deeds and your title company | Which deeds, plats, easements, restrictions and conservation easements are recorded against the parcel? Does the plat carry the planning commission’s endorsement? | The recorded rights over the land, which can bear on access and on what may be built or divided | Notes 5, 16 |
| Floodplain administrator | Is any part of the parcel in a special flood hazard area? Are there elevation certificates or development permits on file? | Development limits and the documents the state office does not keep | Notes 5, 14 |
| TVA (lakefront only) | Is there a Section 26a permit for the shoreline structures? What TVA land or land rights lie between the parcel and the lake? What must a new owner file, and by when? | Whether shoreline construction was approved and whether permits transfer | Note 13 |
See ABODE’s Williamson County and Rutherford County market pages for county context, the College Grove and Leiper’s Fork community pages, and the College Grove, Arrington and Leiper’s Fork guide.
This guide is general information, not legal, tax, engineering or insurance advice. It does not decide whether a parcel can be built on, whether a septic system will be approved, whether an easement exists, or what any tax will be.
Survey and title. We did not find a state or Tennessee Bar page explaining what a survey shows versus what title insurance covers. The Tennessee Real Estate Commission’s page describes its role as regulating real estate brokers and lists no consumer guidance on surveys or title. Ask your attorney and your title company what the commitment excludes and what a survey would add.
Deed restrictions and covenants. These are recorded documents. Common categories include limits on use or building size, architectural or setback standards beyond zoning, utility and access easements, shared-road maintenance agreements and association obligations. Read the recorded instruments and the title commitment; this guide does not summarize any specific restriction.
Mineral and timber rights. We opened no Tennessee statute or agency page on mineral or timber rights, so we state nothing about them. Read the chain of title and ask your attorney whether any have been severed or reserved.
Other items. Lender and insurer requirements, electric and broadband service, the Comptroller’s property classification ratios, TDEC’s own description of conservation easements, and county rules we could not open (the Rutherford County subdivision regulations and the Williamson County flooding and Greenbelt pages) are outside what this guide confirms.
An advisor can help you decide which checks to commission first, usually the ones that can end the deal, such as the septic evaluation, the access documents and the zoning determination. We can bring in the surveyor, attorney, septic soil scientist or lender you choose, and we help you put the right document requests into a contract timeline. ABODE represents buyers and sellers.
ABODE® International Realty has offices at 906 Ridgely Rd, Ste D, Murfreesboro, TN 37129, (615) 260-6010, and at 810 Clinch Ave, Knoxville, TN 37902 (by appointment). You can also call (855) 25-ABODE.
County-wide property tax by city and school-tax district, unincorporated zoning, septic and greenbelt
The 2026 reappraisal, rates, unincorporated zoning and the School Facilities Tax
An unincorporated community under county zoning, with private club communities nearby
An unincorporated village with a National Register historic district
TVA Section 26a dock permits, flowage easements, county jurisdiction, septic and flood checks
TVA reservoir guide: Section 26a dock permits, flowage easements, county rules, septic and flood checks.
A Monroe County town: town zoning versus county, septic and sewer, Tellico Lake and flood checks
Williamson County plans, zoning, septic, water, flood, historic and tax rules, side by side.
Zoning districts, overlays, historic review and city versus county rules in Murfreesboro, TN
TDEC’s permit page sends applications for subsurface sewage disposal system construction permits to its Division of Water Resources, and its FAQ says a TDEC Environmental Scientist conducts the site evaluation (Note 1); the statute refers to a permit from the commissioner (Note 2). In Williamson County, Tennessee, the county’s on-site sewage regulations define a construction permit as a written authorization issued by the county Department of Sewage Disposal Management (Note 7). Confirm which office covers the parcel before ordering a soils map.
TDEC’s permit and FAQ pages do not say (Note 1). The rule text we read, reproduced by Justia with a warning that it may not be current, says a construction permit has an expiration date three years from issuance (Note 2). Ask TDEC or the county in writing, and note that Williamson County’s regulations say permits are governed by the rules in effect when issued and that renewed permits are governed by the rules in effect at approval (Note 7).
Not from anything we opened. Tennessee has a statutory condemnation process for an owner cut off from a public road, and it does not apply if the owner’s own intentional and knowing action caused the cut-off (Note 4). Whether a recorded easement or other right exists is a title question for your attorney.
TDEC says the state licenses well drillers and installers and that wells must follow construction standards, but that Tennessee has no requirements for sampling and analysis of private water supplies (Note 3). It strongly recommends annual bacteria testing and says to ask a lender or buyer which parameters they require (Note 3).
Rollback tax recaptures the taxes saved while land was classified under Greenbelt, for the prior three years (agricultural and forest) or five years (open space) (Notes 9, 10). CTAS says the seller is liable unless a written contract provides otherwise, and a buyer who declares an intent to continue the classification but does not file within 90 days becomes solely responsible (Note 10). Filing dates differ among sources, so ask the assessor (Notes 9, 11).
TDEC says physical alterations to waters of the state require an Aquatic Resource Alteration Permit, and a federal permit from the Army Corps of Engineers may also be required (Note 12). Whether a feature is regulated is a site-specific question for TDEC, the Corps or a consultant.
TVA says permits do not automatically transfer with ownership and that the new owner must apply to TVA for a Section 26a permit within 60 days of closing (Note 13). It also tells buyers and sellers to ensure that all shoreline construction has been approved by TVA. ABODE has pages for Tellico Lake and Fort Loudoun Lake.
The Land Trust for Tennessee says its easements permanently limit how the land can be developed and subdivided and that the terms apply to all future owners, while the owner keeps ownership and may sell or transfer the land (Note 16). The state act’s definition of a conservation easement includes being recorded in the county register’s office. Easements differ, so read the recorded instrument and ask your attorney.
Please tell us what you are weighing. An ABODE advisor replies privately. We aim to reply within one business day.
Your privacy, your choice. Analytics stays off, and nothing is sent to Google Analytics unless you accept. Advertising cookies are never used on this site.