Popular

Planning tool

Build timeline planner

Lay out the phases of a project and see when it could finish

The build timeline planner arranges the phases of a build or land project in order. You type how long each phase takes, any wait before it starts and any overlap with the phase above, and it shows a schedule, a finish date and what a delay would do. ABODE supplies no durations, and nothing you enter is saved or sent.

In short: Type the length of each phase of a build, plus waits and overlaps, and this planner shows a schedule and finish date. ABODE supplies no durations and saves nothing.

Arithmetic on your lengths, not a prediction or a contractor schedule.

Planning tool

Type your phases and lengths

Using it well

How should you use this planner?

  • Ask for each length. Your builder, surveyor, engineer, lender and each office know their own times. Type what they tell you, and ask for it in writing.
  • Remember that some waits belong to an office. For example, the Tennessee Department of Environment and Conservation says it can take up to 45 days to process a complete septic application. Other offices set their own review times, and they change. Ask each one.
  • Try the what-if. Choose a phase and add time to see how far the finish moves. A delay early in the order moves everything after it, unless a later phase does not depend on it. Adjust the overlaps to match how your project really runs.
  • Pair it with the checklists. The builder site checklist lists what to verify and whom to ask, and the construction budget worksheet tracks cost.

More tools are on the planning tools page. This planner is general information, not legal, construction or lending advice.

Questions

Build timeline planner: frequently asked questions

Where do the durations come from?

From you. Ask your builder, surveyor, engineer, lender and each permitting office how long they take, and type those figures. ABODE supplies no durations because they vary by county, season, contractor and project.

Is anything I type saved or sent to ABODE?

No. The planner runs in your browser. Phase names, lengths and dates are not saved, sent or logged, and closing the page clears them. Use Copy as text or Print to keep your own copy.

How does the planner work out the dates?

Each phase starts when the one above it ends, less any overlap you typed, plus any wait you typed. A phase with no length is skipped. The finish is the latest end. With no start date it shows week or day positions instead of dates.

Is the result a schedule I can rely on?

No. It is arithmetic on your figures, useful for comparing what-ifs. Offices, weather, material lead times and inspections can move any phase. Your builder’s written schedule and the offices’ own timelines control.

Why are the phase names pre-filled?

They are a generic starting order for a build on a lot. Rename, reorder, remove or add phases to match your project.

Private consultation

Ask an advisor about your situation

An ABODE advisor replies privately. We aim to reply within one business day.

Sources and notes

  1. Tennessee Department of Environment and Conservation, Subsurface Sewage Disposal System (SSDS) FAQ. Source for the septic processing time. Read October 18, 2026.