Planning tool
Builder site checklist
What to confirm about a lot or acreage before and while you build
This checklist covers what a builder confirms about a homesite, acreage or waterfront lot before buying it, while permitting and at close-out: zoning, septic or sewer, water, power, access, floodplain, wetlands and inspections. Each item says who to ask and what to request. It does not say whether a site is buildable.
In short: A builder checklist for homesites, acreage and waterfront lots: zoning, septic, water, power, access, floodplain, permits and close-out, with whom to ask.
A process guide, not legal, engineering, tax or insurance advice.
Which items apply to you?
Before you buy the site
-
Flood zone, wetlands, soil, slope, drainage and land cover tell you which questions to ask first.
-
The planned house must be allowed, and setbacks, height limits and overlays decide where it can sit.
-
Where there is no sewer, soil decides whether and where a septic system fits. In Tennessee, TDEC evaluates the site and can take up to 45 days after a complete application, so start early.
Tennessee acreage due-diligence guide Source: Tennessee Department of Environment and Conservation, Subsurface Sewage Disposal System (SSDS) FAQ Source: Florida Department of Health, Septic systems (septic permitting moved to the Department of Environmental Protection in 16 counties on January 2, 2025)
-
Public water needs a confirmed connection and fees. A private well needs a site, a driller and test results.
-
A site far from existing lines can add real cost and time.
-
The site needs legal access, and a new driveway onto a public road usually needs approval from the road authority.
-
If any part of the site is in a mapped flood hazard area, building there may need a floodplain permit and a higher floor elevation.
-
Wetlands and streams can limit where grading and construction can happen. Maps can miss them.
-
Slopes, drainage, trees and boundaries drive the design and the cost of site work.
-
A soil map describes a broad area. Borings test the actual ground under the foundation.
-
Shoreline buffers and dock rules can reduce usable area and may need separate approvals.
Tennessee acreage due-diligence guide Florida oceanfront due diligence
Permits and approvals
-
Plan requirements, review times and fees differ by office.
-
Clearing and grading can need erosion control plans and construction stormwater permit coverage, depending on how much ground is disturbed.
-
Tree ordinances, historic overlays and association design review can each add an approval step.
Build and close out
-
A licensed, insured contractor and a written contract protect your schedule and your money.
-
A homeowner policy often does not cover a house under construction.
-
Each stage may need an inspection before the next one starts. For a septic system in Tennessee, the installer schedules a final inspection before it is covered.
How should you use this checklist?
- Treat each “Ask” as a real person. A licensed professional or an office decides each question. The checklist only tells you whom to ask and what to request.
- Get answers in writing. A letter, a permit, a report or a recorded document is evidence. A phone answer is not.
- Read the public-source readings first. Run the address lookup to see flood zone, wetlands, soil, elevation, slope, drainage and land cover for a site. Each reading is context at one point, not a determination.
- Run the numbers. The construction budget worksheet adds up the costs from figures you type.
- Lay out the schedule. The build timeline planner arranges phases, waits and overlaps from lengths you type. The county offices finder names which office to ask in your county.
- Rules change. Sources were read October 18, 2026. Confirm the current rule with the named office or your attorney.
More checklists are on the planning tools page.
Builder site checklist: frequently asked questions
Can this checklist tell me whether a site is buildable?
No. Zoning, soils, flood zone, wetlands and utilities each need an answer from the office or professional who decides them. The checklist lists whom to ask.
Why do septic questions come so early?
Where there is no sewer, soil decides whether and where a septic system fits. In Tennessee the state environmental department can take up to 45 days to process a complete application, so the site evaluation is worth ordering early.
Is anything I tick saved or sent to ABODE?
No. The list runs in your browser. Ticks and choices are not saved, sent or logged. Use Copy as text or Print to keep your own copy.
Ask an advisor about your situation
An ABODE advisor replies privately. We aim to reply within one business day.
Sources and notes
- Tennessee Department of Environment and Conservation, Subsurface Sewage Disposal System (SSDS) FAQ. Read October 18, 2026.
- Florida Department of Health, Septic systems (septic permitting moved to the Department of Environmental Protection in 16 counties on January 2, 2025). Read October 18, 2026.
- FEMA Map Service Center. Read October 18, 2026.