Miami-Dade County · Branded residences

Aston Martin Residences, Miami

A downtown Miami waterfront condominium tower, with the figures sources agree on and the ones they do not

Aston Martin Residences is a condominium tower at 300 Biscayne Boulevard Way in downtown Miami, developed by G&G Business Developments with Aston Martin as the brand. The general contractor reported a temporary certificate of occupancy on April 18, 2024. Sources disagree on size: 66 or 70 stories and 391 or 393 residences.

In short: Aston Martin Residences is a condominium tower at 300 Biscayne Boulevard Way in downtown Miami; its general contractor reported a temporary certificate of occupancy in April 2024.

Private, strategy-first conversations. Consultation requests do not trigger drip campaigns.

Overview

Aston Martin Residences at a glance

Aston Martin Residences, Florida. Updated .
FactValueSource
Project nameAston Martin ResidencesNote 1
Address300 Biscayne Boulevard Way, MiamiNotes 1, 2
LocationDowntown Miami waterfront. Wikipedia places it along the Miami River and Biscayne Bay, and describes downtown Miami as lying in Miami-Dade County with Biscayne Bay to its eastNotes 4, 6, 7
DeveloperG&G Business DevelopmentsNotes 1, 4
BrandAston Martin. The brand’s 2019 release credits its own design team, led by its chief creative officer, Marek ReichmanNote 1
ArchitectsRevuelta Architecture International is the architect of record and BodasMiani Anger is the design architectNote 4
General contractorCoastal ConstructionNotes 3, 4
TypeA condominium. A December 2021 report describes 391 condominiums and penthousesNote 3
Stories66 in the brand’s 2019 release and on Wikipedia. The general contractor’s 2024 release and project page say 70. The sources conflictNotes 1, 6, 4, 5
Height818 feet in the brand’s 2019 release, 817 feet on Wikipedia and 821 feet in the general contractor’s release. The sources conflictNotes 2, 6, 4
Residences391 in a December 2021 report and on Wikipedia. The general contractor’s 2024 release and project page say 393. The sources conflictNotes 3, 6, 4, 5
Status as of October 6, 2026Completed. The general contractor’s release of May 7, 2024 says the temporary certificate of occupancy was achieved on April 18, 2024. Wikipedia lists April 30, 2024 as the completion dateNotes 4, 6
Earlier delivery projectionsA 2019 release projected completion in 2022, and a December 2021 report gave a target of the end of 2022. These were projections made during constructionNotes 1, 3

The brand’s 2019 release, a 2021 report and the general contractor’s 2024 release describe the same building with different story, height and unit figures. This page shows each figure with its source rather than picking one. See the branded residences index for other projects.

Setting

Where is the building?

The tower stands on the downtown Miami waterfront, where the Miami River meets Biscayne Bay.

  • Wikipedia’s downtown Miami entry says the area is divided by the Miami River, has Biscayne Bay to its east and lies in Miami-Dade County (Note 7).
  • The general contractor describes the project as on the downtown Miami waterfront, and Wikipedia places it along the Miami River and Biscayne Bay (Notes 4, 6).
  • The brand’s 2019 release gives the address as 300 Biscayne Boulevard Way in Miami (Note 1).
Florida rules

Which Florida rules apply to a purchase here?

The sources describe a completed building, so most purchases are resales, where a unit owner sells to a buyer. The developer-sale rules below apply only if a unit is bought directly from the developer. The sources checked do not say whether any units remain with it.

  • Resale (unit owner to buyer). Section 718.503(2) lists documents a non-developer unit owner must give a prospective buyer at the seller’s expense, including the declaration of condominium, articles of incorporation, bylaws and rules, the annual financial statement and budget, the milestone inspection summary if applicable, the structural integrity reserve study or a statement that none exists, the inspection report for a turnover inspection performed on or after July 1, 2023, and a frequently-asked-questions document. The contract must either acknowledge that the buyer received them more than 7 days before signing or give the buyer a right to cancel within 7 days, excluding Saturdays, Sundays and legal holidays (Note 8).
  • Purchase from the developer, if any units are still offered. Section 718.503(1) makes the contract voidable by the buyer within 15 days after signing and receipt of all required items (Note 8). Section 718.202 applies when construction, furnishing and landscaping are not yet substantially complete at contracting. It then requires buyer payments up to 10 percent of the sale price to go into an escrow account, and payments above that to be held in a special escrow account that the developer may not use before closing, subject to the exceptions in the statute (Note 11). Section 718.504 requires the developer of a residential condominium with more than 20 units to prepare a prospectus or offering circular, file it with the state division and give a copy to each buyer (Note 12).
  • Milestone inspection. A condominium or cooperative building of three or more habitable stories must be inspected by December 31 of the year it reaches 30 years of age, measured from its certificate of occupancy, and every 10 years after. A local enforcement agency may require 25 years where conditions such as nearness to salt water warrant it. The association must give each owner the inspector’s summary within 45 days of receiving the report (Note 9). If this building’s certificate of occupancy was issued in 2024, ABODE’s arithmetic puts the 30-year deadline in 2054, or 2049 on a 25-year schedule. Confirm the certificate date and the local rule.
  • Structural integrity reserve study. A residential condominium association must have a study completed at least every 10 years after the condominium’s creation for each building three habitable stories or higher. It covers the roof, structure, fireproofing and fire protection, plumbing, electrical systems, waterproofing and exterior painting, windows and exterior doors, and any other item over $25,000 (or the inflation-adjusted amount) that affects those (Note 10).

These are plain-language summaries of the 2026 statute text on flsenate.gov. They are not legal advice, and the statutes change. Ask your attorney to confirm which rules apply to your contract.

Due diligence

What should you check before buying a unit here?

Checks for a recently completed waterfront condominium tower with a branded partner. Sourced where noted.
CheckWhy it matters hereSource
Unit count and unit scheduleSources give 391 or 393 residences. Ask for the declaration of condominium, a required resale document, to see how the association counts unitsNotes 3, 4, 8
Certificate of occupancy dateThe general contractor reports a temporary certificate on April 18, 2024, and Wikipedia lists April 30, 2024 as the completion date. Ask the building department with jurisdiction for the temporary and final certificate recordsNotes 4, 6
Turnover inspection reportA resale package must include the inspection report for a turnover inspection performed on or after July 1, 2023. A building completed in 2024 may have one, so ask whether it exists and what it coversNote 8
Developer control of the associationAsk whether the developer still controls the association’s board or still owns units, and what has passed to the ownersABODE
Milestone inspection statusOn a 30-year schedule from a 2024 certificate, the first inspection would fall in 2054. Ask whether any inspection has been done, and read the inspector’s summary if one existsNotes 9, 8
Structural integrity reserve studyAsk whether the association has completed one, when, and what the current budget funds. A seller must provide the latest study or state that none was completedNotes 10, 8
Rules and use restrictionsThe bylaws and rules are part of the resale package. Confirm what they say about rentals, guests, pets and the intended use before the cancellation window closesNote 8
Flood zone and insuranceFlood zone is specific to the parcel. Look up the address on FEMA’s map service and get wind and flood coverage quotes before you commitNote 13
Claims, litigation and assessmentsAsk the seller and the association whether any claim, construction-defect notice or lawsuit involves the association or the developer, and whether a special assessment has been approved or proposedABODE

This is a checklist, not advice. Confirm each item with the association, the building department and your attorney.

Comparison

How does it compare with other branded residences?

Two other branded Florida condominium projects, compared only on facts found in the sources cited. Sourced where noted.
ProjectWhereWhat the sources show
Ritz-Carlton ResidencesSunny Isles Beach, Miami-Dade County, on the oceanfrontA 52-story tower with 212 residences in the developers’ February 2020 release, developed by Fortune International Group and Château Group, with The Ritz-Carlton named as manager. Other sources differ on stories and units, which its own page sets out. A temporary certificate was announced in February 2020 (Note 14)
FENDI Chateau ResidencesSurfside, Miami-Dade County, on the oceanfrontA 12-story building with 58 or 60 units, developed by Château Group in a partnership with Fendi. Trade press in 2016 said it was scheduled to open that fall (Note 15)
Aston Martin Residences (this page)Downtown Miami, on the waterfrontA condominium tower reported at 66 or 70 stories and 391 or 393 residences, developed by G&G Business Developments, with a temporary certificate reported on April 18, 2024 (Notes 1, 4, 3)

Brand, developer, height and status differ across the three projects, and some sources conflict on counts.

Working with ABODE

How does ABODE help with a purchase here?

ABODE International Realty is a Florida-licensed brokerage with its office on West Bay Drive in Largo. It represents buyers and sellers of condominiums statewide. ABODE is not affiliated with Aston Martin or G&G Business Developments, does not speak for them, and does not claim to hold this project’s sales listings. Their names appear here only to identify the building. Before you sign anything with any agent, ask for a written disclosure of whom that agent represents. We keep conversations private.

Talk about buying   Talk about selling

Keep reading
Questions

Aston Martin Residences real estate: frequently asked questions

What is Aston Martin Residences in Miami?

It is a condominium tower at 300 Biscayne Boulevard Way on the downtown Miami waterfront (Notes 1, 4, 3). G&G Business Developments is the developer, and the brand’s 2019 release credits Aston Martin’s own design team (Note 1).

Is the building finished?

Yes, according to the sources checked as of October 6, 2026. The general contractor said the temporary certificate of occupancy was achieved on April 18, 2024 (Note 4), and Wikipedia lists April 30, 2024 as the completion date (Note 6). A 2019 release had projected 2022 (Note 1).

How many stories and residences does it have?

The sources disagree. The brand’s 2019 release and Wikipedia say 66 stories, while the general contractor’s 2024 release says 70 (Notes 1, 6, 4). A December 2021 report and Wikipedia say 391 residences, and the general contractor says 393 (Notes 3, 6, 4). The declaration of condominium is the document to check.

Do developer rules or resale rules apply when buying here?

For a unit bought from an owner, Florida’s resale disclosure rules in section 718.503(2) apply, including the inspection report for a turnover inspection performed on or after July 1, 2023 (Note 8). Developer rules, including the 15-day cancellation right, deposit escrow and the prospectus, apply only to a unit bought from the developer (Notes 8, 11, 12). The sources checked do not say whether any units are still offered by it.

When would the first milestone inspection be due?

Florida requires a milestone inspection by December 31 of the year a condominium building of three or more habitable stories reaches 30 years from its certificate of occupancy, unless the local enforcement agency requires 25 years (Note 9). If this building’s certificate was issued in 2024, that works out to 2054, or 2049 on a 25-year schedule. Confirm the certificate date and the local rule.

Is ABODE International Realty affiliated with Aston Martin or the developer?

No. ABODE International Realty is a Florida-licensed brokerage with its office at 801 West Bay Drive, Suite 324, in Largo. It represents buyers and sellers of condominiums statewide, is not affiliated with the brand or the developer, and does not claim to hold this project’s sales listings. Ask for a written disclosure of whom an agent represents before you sign.

Private consultation

Request a private Aston Martin Residences consultation

Tell us what you are weighing. An ABODE advisor replies privately. We aim to reply within one business day.

Sources and notes

  1. Aston Martin Media: Aston Martin Residences starts to rise into the Miami skyline (August 5, 2019). The brand’s own press release, published during construction. Source for the address, the developer, the 66-story count, the brand’s design role and the 2022 completion target at that time. It describes the plan, not the finished building. Checked October 6, 2026
  2. Aston Martin Media: Aston Martin Residences press release (August 2019). The brand’s own press release, published during construction. Source for the 66-story and 818-foot figures and the downtown Miami location. Checked October 6, 2026
  3. PROFILEmiami: Aston Martin Residences tops out (December 6, 2021). Secondary source: South Florida real estate publication. Source for the 391 residences, the general contractor and the end-of-2022 completion target as of December 2021. Checked October 6, 2026
  4. Coastal Construction Group: Announces TCO for Aston Martin Residences (May 7, 2024). Release from the project’s general contractor, a party to the project. Source for the April 18, 2024 temporary certificate of occupancy, the architects, and a count of 70 stories, 821 feet and 393 residences, which differ from the 66 stories, 818 feet and 391 residences in other sources. Checked October 6, 2026
  5. Coastal Construction: Aston Martin Residences (project page). The general contractor’s project page, which repeats 70 stories, 393 units, 821 feet and a 2024 completion. Checked October 6, 2026
  6. Aston Martin Residences (Wikipedia). Secondary source. Lists 66 stories, 817 feet, 391 residences, a completion date of April 30, 2024, the river-and-bay location and coordinates. Checked October 6, 2026
  7. Greater Downtown Miami (Wikipedia). Secondary source for downtown Miami’s county and its position relative to Biscayne Bay and the Miami River. Checked October 6, 2026
  8. Florida Statutes, section 718.503 (developer and nondeveloper unit owner disclosure prior to sale; voidability), 2026. Subsection (1) covers sales by a developer; subsection (2) covers sales by a unit owner who is not the developer. Laws change; confirm the current text with your attorney. Checked October 6, 2026
  9. Florida Statutes, section 553.899 (mandatory structural inspections for condominium and cooperative buildings), 2026. Milestone inspection rules. The law has been amended recently; confirm the current text with the association and your attorney. Checked October 6, 2026
  10. Florida Statutes, section 718.112(2)(g) (structural integrity reserve study), 2026. Structural integrity reserve study (SIRS) requirement. Confirm the current text with the association and your attorney. Checked October 6, 2026
  11. Florida Statutes, section 718.202 (sales or reservation deposits prior to closing), 2026. Escrow of buyer deposits paid to a developer before closing. Relevant only to a purchase from a developer. Checked October 6, 2026
  12. Florida Statutes, section 718.504 (prospectus or offering circular), 2026. Prospectus or offering circular for developers of residential condominiums with more than 20 units. Relevant only to a purchase from a developer. Checked October 6, 2026
  13. FEMA Flood Map Service Center. Look up the flood zone for any address. Flood zone is parcel specific
  14. Business Wire: Developers of The Ritz-Carlton Residences, Sunny Isles Beach receive TCO (February 24, 2020). Press release distributed by Business Wire and headlined as coming from the developers. Used in the comparison for the 52 stories, 212 residences, developers and the temporary certificate of occupancy announced in February 2020. Checked October 6, 2026
  15. Multi Housing News: Fendi Lands in US with Oceanfront Condos (August 24, 2016). Secondary source: trade press. Used in the comparison for the 58 units, 12 stories, the Fendi and Château Group joint venture and the fall 2016 opening plan. Another source lists 60 units. Checked October 6, 2026
  16. ABODE local knowledge. Comparisons and plain-language descriptions reflect ABODE’s experience and are not statistics