Miami-Dade County · Branded residences

Porsche Design Tower, Sunny Isles Beach

A Sunny Isles Beach condominium tower built with Porsche Design, listed by its developer as completed

Porsche Design Tower is a condominium tower at 18555 Collins Avenue in Sunny Isles Beach, Florida. Developer Dezer Development lists it as a completed 60-story building with 132 residences, built under a licensing agreement with Porsche Design. Sources report a 2017 completion, and one source counts 59 stories instead of 60.

In short: As of October 2026, Dezer Development lists Porsche Design Tower, at 18555 Collins Avenue in Sunny Isles Beach, Florida, as a completed condominium tower with 132 residences.

Private, strategy-first conversations. Consultation requests do not trigger drip campaigns.

Overview

Porsche Design Tower at a glance

Porsche Design Tower, Florida. Updated .
FactValueSource
Address18555 Collins Avenue, Sunny Isles Beach, FloridaNotes 3, 4
DeveloperDezer Development. Porsche’s newsroom says Dezer Signature Brands, a subsidiary of Dezer Development, has a master licensing agreement with Porsche DesignNotes 1, 7
BrandPorsche Design, named by the developer as its brand partnerNote 1
ArchitectsThe general contractor’s page lists Porsche Design Studio and Sieger Suarez Architectural PartnershipNote 5
StoriesThe developer, Wikipedia and SOCOTEC say 60. The general contractor’s page says 59Notes 1, 4, 6, 5
Residences132, the same figure in the developer’s page and in four other sourcesNotes 1, 3, 4, 5, 6
Height641 feet (about 195 meters), per Wikipedia and SOCOTECNotes 4, 6
StatusAs of October 6, 2026, the developer’s site lists the tower under “Completed Developments”Note 2
Completion year2017 in the general contractor’s page, SOCOTEC and Wikipedia (which gives January 2017). The developer’s page gives no yearNotes 5, 6, 4
Vehicle elevatorThe developer describes a patented automobile elevator, the Dezervator, that lets residents park in “sky garages” next to their unitsNote 1

Compare with other Sunny Isles Beach branded towers: Residences by Armani/Casa and Bentley Residences Miami. Browse all branded residences.

The building

What do the published sources say about the building?

Most facts agree across sources. The one difference, 60 stories against 59, is shown in the table above.

  • The tower is at 18555 Collins Avenue in Sunny Isles Beach, Miami-Dade County (Notes 3 and 4).
  • The developer lists individual plunge pools on the balconies of most units (Note 1).
  • The developer lists a spa with Vichy showers, a sunset terrace with two oversized spa tubs, an oceanfront ballroom, a movie theater, a game room with racing simulators and a car concierge service (Note 1).
  • Wikipedia says the building has three elevators for vehicles that place each car in a garage next to the owner’s unit (Note 4).

Amenity lists are the developer’s own marketing and may change. Ask the association which amenities exist today, who operates them and what they cost owners.

Florida rules

Which Florida rules apply when buying here?

The developer lists the tower as completed (Note 2), so most purchases here would be resales from an earlier owner. A purchase directly from the developer, if a developer still holds units, follows different disclosure rules.

  • Resale disclosure. Section 718.503(2) requires an owner who is not a developer to give the buyer, before the sale, the declaration of condominium, the association’s articles, bylaws and rules, the annual financial statement and budget, the inspector’s summary of the milestone inspection report and the association’s most recent structural integrity reserve study. It also lists a turnover inspection report for turnover inspections performed on or after July 1, 2023 (Note 11).
  • The same subsection includes contract language that lets a buyer cancel within seven days, excluding Saturdays, Sundays and legal holidays, after the date of execution. Read how that period works with your attorney (Note 11).
  • Buying from the developer. Section 718.503(1) governs contracts for the sale of a residential unit by a developer and calls for documents including the question and answer sheet, the declaration, the estimated operating budget and the form of sale agreement (Note 11).
  • Structural integrity reserve study (SIRS). Section 718.112(2)(g) requires a residential condominium association to have a SIRS completed at least every 10 years after the condominium’s creation for each building of three habitable stories or higher. It covers the roof, structure, fireproofing and fire protection, plumbing, electrical systems, waterproofing and exterior painting, windows and exterior doors, and any other item above the statute’s dollar threshold for deferred maintenance or replacement cost that affects those. Before a developer turns control over to owners, it must have a turnover inspection report for each building three stories or higher (Note 12).
  • Milestone inspection. Section 553.899 requires a structural milestone inspection for condominium buildings of three or more habitable stories by December 31 of the year the building reaches 30 years from its certificate of occupancy, and every 10 years after. A local enforcement agency may require it at 25 years instead (Note 13). If the certificate of occupancy here was issued in 2017, 30 years from it is 2047, and 25 years is 2042. The certificate date itself is not stated on this page.

Confirm the certificate of occupancy date, any milestone inspection summary and the SIRS with the association before relying on any date above.

Due diligence

What should you check before buying in Porsche Design Tower?

Checks for a completed Florida condominium tower with a vehicle-elevator system. Sourced where noted.
CheckWhy it matters hereSource
Story count in the documentsOne source counts 59 stories and others count 60. Confirm in the declaration of condominium and the recorded plat how floors and units are numbered before relying on any figureNotes 1, 4, 5, 6
Certificate of occupancy dateSources report 2017, but the milestone inspection year under s.553.899 runs from the certificate of occupancy. Ask the association or the building department for the dateNotes 4, 5, 6, 13
Milestone inspection summaryA seller must provide the inspector-prepared summary of the milestone inspection report if one exists. Ask whether the building has had one, or when one is dueNotes 11, 13
Structural integrity reserve studyA seller must provide the association’s most recent SIRS. Ask when it was completed, which items it covers and whether the budget funds itNotes 11, 12
Turnover inspection reportDevelopers must have a turnover inspection report before turning over control, and s.718.503(2) lists the report for turnovers on or after July 1, 2023. Ask when control was turned over and request the report if one existsNotes 11, 12
Vehicle elevator and sky garagesThe developer describes a patented automobile elevator and garages beside units. Ask the association who maintains the system, what the budget reserves for it and how the garage is described in the unit’s legal documentsNote 1
Budget, dues and amenity operationsCompare the annual budget and financial statement with the amenities the developer lists. Ask which amenities are run by the association and which by third partiesNotes 1, 11
Developer-held unitsIf you are buying from the developer rather than a prior owner, the developer-disclosure rules in s.718.503(1) apply. Ask the seller which category appliesNote 11

This is a checklist, not advice. Confirm each item with the association, the building department and your attorney.

Comparison

How does it compare with other Sunny Isles Beach branded towers?

Two other branded condominium towers in Sunny Isles Beach, each with its own page. Status as of October 6, 2026, from the developer’s site.
ProjectBrand and developerStatus and how it differs
Residences by Armani/CasaArmani/Casa Interior Design Studio; Dezer Development with The Armani Group and The Related GroupListed by the developer as completed, with 308 residences and 60 stories, against 132 and 60 here. Published unit counts and completion years conflict (Notes 8, 2)
Bentley Residences MiamiBentley Motors; Dezer DevelopmentUnder construction. A June 2026 report put the superstructure at seven levels and projected 2028 completion, so a buyer there follows new-construction rules, not resale rules (Notes 9, 10, 2)

Porsche Design Tower and Residences by Armani/Casa are both on the developer’s completed list (Note 2). Bentley Residences Miami is on its current list.

Working with ABODE

How does ABODE help with Porsche Design Tower?

ABODE International Realty is a Florida-licensed brokerage with its office in Largo. It represents buyers and sellers of condominiums statewide. ABODE is not affiliated with, and does not speak for, Porsche, Porsche Design or Dezer Development, and it does not claim to hold sales listings for this project. Those names appear on this page only to identify the building.

Before you sign anything with any brokerage, ask for its representation disclosure in writing and ask whom it represents in your transaction. If you are weighing a purchase or a sale in this building, ABODE can go through the association documents listed above with you and your attorney.

Talk about buying   Talk about selling

Keep reading
Questions

Porsche Design Tower real estate: frequently asked questions

What is Porsche Design Tower in Sunny Isles Beach?

It is a condominium tower at 18555 Collins Avenue in Sunny Isles Beach, Florida (Notes 3 and 4). Dezer Development lists it as a completed 60-story building with 132 residences and names Porsche Design as its brand partner (Note 1).

Is Porsche Design Tower completed?

As of October 6, 2026, the developer’s site lists it under completed developments (Note 2). The general contractor’s page and SOCOTEC give 2017, and Wikipedia gives January 2017 (Notes 5, 6, 4). The developer’s page gives no year, so ask the association for the certificate of occupancy date.

How many residences and stories does Porsche Design Tower have?

The developer and four other sources list 132 residences (Notes 1, 3, 4, 5, 6). The developer, Wikipedia and SOCOTEC say 60 stories, while the general contractor’s page says 59 (Notes 1, 4, 6, 5). Confirm floor and unit numbering in the declaration of condominium.

What disclosure rules apply when buying a resale here?

Section 718.503(2) requires an owner who is not a developer to give the buyer the declaration, the association’s articles, bylaws and rules, the annual financial statement and budget, the inspector’s summary of any milestone inspection report and the most recent structural integrity reserve study (Note 11). Buying directly from a developer follows section 718.503(1) instead.

Does a milestone inspection apply to this building?

Florida requires a milestone inspection for condominium buildings of three or more habitable stories by December 31 of the year they reach 30 years from the certificate of occupancy, and every 10 years after. A local agency may require it at 25 years (Note 13). The certificate date decides when it falls due, so ask the association for it and for any inspection summary.

Does ABODE International Realty sell units in Porsche Design Tower?

ABODE is a Florida-licensed brokerage with its office at 801 West Bay Drive, Suite 324, in Largo. It represents buyers and sellers of condominiums statewide, but it is not affiliated with Porsche Design or the developer and does not claim to hold this project’s sales listings. Ask any brokerage for its representation disclosure before you sign.

Private consultation

Request a private Porsche Design Tower consultation

Tell us what you are weighing. An ABODE advisor replies privately. We aim to reply within one business day.

Sources and notes

  1. Dezer Development: Porsche Design Tower (developer’s page). Developer’s own page. Source for developer, brand partner, stories, residence count, the vehicle elevator, balcony pools and the amenity list, all attributed to the developer. Marketing text; confirm facts in recorded documents. Checked October 6, 2026.
  2. Dezer Development (home page: completed and current developments). Developer’s project list. Source for the status line: the tower appears under “Completed Developments”. Checked October 6, 2026.
  3. The Real Deal: Dezer has 80% of Porsche units under contract (December 20, 2013). Secondary source (trade press) from the sales period. Source for the street address, 60 stories and 132 units as planned. Its sales and pricing figures are not used. Checked October 6, 2026.
  4. Porsche Design Tower (Sunny Isles Beach), Wikipedia. Secondary, user-edited source. Source for the address, 60 stories, 641 feet, 132 units, January 2017 completion and the vehicle elevators. Confirm in recorded documents. Checked October 6, 2026.
  5. Coastal Construction: Porsche Design Tower Miami (general contractor’s project page). Contractor’s own page, not a public record. Source for 59 stories, 132 units, 2017 completion and the architects it lists. Conflicts with other sources on stories. Checked October 6, 2026.
  6. SOCOTEC: Porsche Design Tower, Sunny Isles Beach (project page). Project page of an engineering firm, a secondary source. Source for 60 stories, 132 residential units, 641 feet and 2017 completion. Checked October 6, 2026.
  7. Porsche Newsroom: Porsche Design Tower Miami (March 20, 2017). Brand’s own newsroom. Source for the statement that Dezer Signature Brands, a subsidiary of Dezer Development, has a master licensing agreement with Porsche Design. Checked October 6, 2026.
  8. Dezer Development: Residences by Armani/Casa (developer’s page). Developer’s own page. Source for the comparison row: 60 stories, 308 residences, completed. Other sources differ on unit count; see that project’s page. Checked October 6, 2026.
  9. Bentley Motors media: Bentley Residences Miami breaks ground (2024). Brand’s own press release. Source for the comparison row: 62 stories, 216 residences, groundbreaking in 2024. Checked October 6, 2026.
  10. Florida YIMBY: Construction goes vertical on 62-story Bentley Residences (June 4, 2026). Secondary source (local development press). Source for the construction stage and the 2028 projection in the comparison row. Checked October 6, 2026.
  11. Florida Statutes, section 718.503 (2026), Developer disclosure prior to sale; nondeveloper unit owner disclosure prior to sale; voidability. Source for the developer-disclosure documents in subsection (1) and the non-developer (resale) documents and cancellation language in subsection (2). The law is amended often; confirm the current text with your attorney. Checked October 6, 2026.
  12. Florida Statutes, section 718.112 (2026), Bylaws, subsection (2)(g). Source for the structural integrity reserve study requirement, its items and the developer turnover inspection report. The law is amended often; confirm the current text with your attorney. Checked October 6, 2026.
  13. Florida Statutes, section 553.899 (2026), Mandatory structural inspections for condominium and cooperative buildings. Source for the milestone inspection rule and the local 25-year option. The law is amended often; confirm the current text with your attorney. Checked October 6, 2026.
  14. ABODE local knowledge. Plain-language descriptions of the checks reflect ABODE’s experience and are not statistics or legal advice