# Construction budget worksheet

Track budget against quotes for each part of a build

This worksheet lists the parts of a build, from survey and site work through structure, systems, interior and carrying costs, with a budget column and a quote column for each. It totals each group, adds the contingency you choose and compares quotes with budget. ABODE supplies no costs, and nothing you enter is saved or sent.

In short: A construction budget worksheet with a budget column and a quote column for each part of a build, totals by group and a contingency you choose.

## Type your numbers

This worksheet needs JavaScript to add up your numbers. The fields below still work as a fill-in list you can print.

**Nothing you type is saved or sent.** The worksheet runs in your browser and ABODE supplies no rates, prices or costs: every figure is yours. Results are arithmetic on those figures, not a quote, a loan offer, an appraisal or advice. October 18, 2026.

Copy as text

Print

Clear all numbers

[Go to results](#ws-rh)

Land and site work

LineBudgetQuote or actual

Survey and staking

\$

\$

Soil or geotechnical testing

\$

\$

Clearing and demolition

\$

\$

Grading and fill

\$

\$

Septic system or sewer connection

\$

\$

Well or water connection

\$

\$

Electric service connection

\$

\$

Driveway and culvert

\$

\$

Permits, fees and professionals

LineBudgetQuote or actual

Building permit and plan review

\$

\$

Impact and utility connection fees

\$

\$

Plans and engineering

\$

\$

Legal and title

\$

\$

Inspections and testing

\$

\$

Structure

LineBudgetQuote or actual

Foundation

\$

\$

Framing

\$

\$

Roofing

\$

\$

Windows and exterior doors

\$

\$

Siding and exterior finish

\$

\$

Systems

LineBudgetQuote or actual

Plumbing

\$

\$

Electrical

\$

\$

Heating and cooling

\$

\$

Insulation

\$

\$

Interior

LineBudgetQuote or actual

Drywall and paint

\$

\$

Flooring

\$

\$

Cabinets and countertops

\$

\$

Interior doors and trim

\$

\$

Appliances

\$

\$

Lighting and fixtures

\$

\$

Site finish

LineBudgetQuote or actual

Drainage and erosion control

\$

\$

Landscaping

\$

\$

Paving, walks and patios

\$

\$

Carrying and other costs

LineBudgetQuote or actual

Builder’s risk insurance

\$

\$

Construction loan interest and fees

\$

\$

Property taxes during construction

\$

\$

Utilities during construction

\$

\$

Other costs

\$

\$

Project size and contingency

Heated square feet (optional)

Used only to show the total per square foot.

Contingency as a percent of the budget

%

The cushion you choose to hold for surprises. ABODE does not suggest a figure.

## Results

Results need JavaScript. Without it, use the fields as a printable list.

## How should you use this worksheet?

- Enter your own budget for each line you expect to need and leave the rest blank.
- Replace budget figures with written quotes as contractors and suppliers give them.
- Set the contingency you want to hold. ABODE does not suggest a percentage.
- Compare the lines where you have both a budget and a quote to see where you are over or under.
- **Pair it with the checklist.** The [builder site checklist](https://abodeintlrealty.com/tools/builder-site-checklist/) lists what to verify and whom to ask.

More tools are on the [planning tools page](https://abodeintlrealty.com/tools/). This worksheet is general information, not legal, tax, lending, insurance or investment advice.

## Construction budget worksheet: frequently asked questions

Does ABODE tell me what things cost?

No. ABODE publishes no unit costs. Costs depend on the site, the design, the market and the date, so they come from your bids and quotes.

What does the comparison include?

Only lines where you entered both a budget and a quote. A line with only a quote or only a budget is counted in its own column but not in the comparison.

Is anything I type saved or sent to ABODE?

No. The worksheet runs in your browser. Numbers are not saved, sent or logged, and closing the page clears them. Use Copy as text or Print to keep your own copy.