# Builder site checklist

What to confirm about a lot or acreage before and while you build

This checklist covers what a builder confirms about a homesite, acreage or waterfront lot before buying it, while permitting and at close-out: zoning, septic or sewer, water, power, access, floodplain, wetlands and inspections. Each item says who to ask and what to request. It does not say whether a site is buildable.

In short: A builder checklist for homesites, acreage and waterfront lots: zoning, septic, water, power, access, floodplain, permits and close-out, with whom to ask.

## Which items apply to you?

Property typeAll property typesSingle homesiteAcreage or rural siteWaterfront or lake lot

StateAll statesTennesseeFlorida

Copy as text

Print

Clear ticks

**Nothing you tick or choose is saved or sent.** The list runs in your browser. Use Copy as text or Print to keep your own copy. This is a process guide, not legal, engineering, tax or insurance advice, and October 18, 2026 is the date its sources were read.

## Before you buy the site

1.  Read the public-source readings

    Flood zone, wetlands, soil, slope, drainage and land cover tell you which questions to ask first.

    Ask  
    No one yet. This is background, not a determination.

    [Read the public-source readings for the address](https://abodeintlrealty.com/property-research/lookup/)

2.  Confirm zoning, allowed use, setbacks and overlays

    The planned house must be allowed, and setbacks, height limits and overlays decide where it can sit.

    Ask  
    The city or county planning office.

    Request  
    A zoning verification letter or written answers on use, setbacks, height, lot coverage and overlays.

3.  Check sewer or septic

    Where there is no sewer, soil decides whether and where a septic system fits. In Tennessee, TDEC evaluates the site and can take up to 45 days after a complete application, so start early.

    Ask  
    The sewer utility, or the septic permitting office for the county: in Tennessee the state environmental department’s local office or the county health department; in Florida the county health department or, in the 16 counties listed on the Florida Department of Health page, the Department of Environmental Protection.

    Request  
    A sewer availability letter, or a septic site evaluation with property corners and the house pad staked.

    [Tennessee acreage due-diligence guide](https://abodeintlrealty.com/guides/tennessee-acreage-due-diligence/) [Source: Tennessee Department of Environment and Conservation, Subsurface Sewage Disposal System (SSDS) FAQ](https://www.tn.gov/environment/permits/water/septic-systems-permits/ssp/ssds-faqs.html) [Source: Florida Department of Health, Septic systems (septic permitting moved to the Department of Environmental Protection in 16 counties on January 2, 2025)](https://www.floridahealth.gov/environmental-health/septic-systems/)

4.  Check water

    Public water needs a confirmed connection and fees. A private well needs a site, a driller and test results.

    Ask  
    The water utility, or a licensed well driller.

    Request  
    A written availability and tap-fee letter, or a drilling estimate and test plan.

5.  Check power and broadband, and line extension cost

    A site far from existing lines can add real cost and time.

    Ask  
    The electric utility and local internet providers.

    Request  
    Written service availability and a line extension estimate.

6.  Confirm recorded access and the driveway permit

    The site needs legal access, and a new driveway onto a public road usually needs approval from the road authority.

    Ask  
    Title company; the county or state road authority.

    Request  
    Recorded access easement and the driveway permit requirements.

7.  Check the floodplain

    If any part of the site is in a mapped flood hazard area, building there may need a floodplain permit and a higher floor elevation.

    Ask  
    The local floodplain administrator.

    Request  
    A written answer on the flood zone, base flood elevation and elevation requirements.

    [Source: FEMA Map Service Center](https://msc.fema.gov/portal/home)

8.  Ask about wetlands and streams

    Wetlands and streams can limit where grading and construction can happen. Maps can miss them.

    Ask  
    The U.S. Army Corps of Engineers and the state environmental agency; a wetland consultant if needed.

    Request  
    A jurisdictional determination or a consultant’s letter.

9.  Order a topographic and boundary survey

    Slopes, drainage, trees and boundaries drive the design and the cost of site work.

    Ask  
    A licensed land surveyor.

    Request  
    A boundary and topographic survey with the planned building area marked.

10. Get a geotechnical opinion on steep or soft ground

    A soil map describes a broad area. Borings test the actual ground under the foundation.

    Ask  
    A geotechnical engineer.

    Request  
    A written report with foundation recommendations.

11. Check shoreline, dock and buffer rules

    Shoreline buffers and dock rules can reduce usable area and may need separate approvals.

    Ask  
    The agency that controls the shoreline (on a Tennessee Valley Authority lake, TVA), and the city or county.

    Request  
    Written buffer and dock requirements for this parcel.

    For: Waterfront or lake lot

    [Tennessee acreage due-diligence guide](https://abodeintlrealty.com/guides/tennessee-acreage-due-diligence/) [Florida oceanfront due diligence](https://abodeintlrealty.com/guides/florida-oceanfront-due-diligence/)

## Permits and approvals

1.  Ask what the building permit needs

    Plan requirements, review times and fees differ by office.

    Ask  
    The building department.

    Request  
    The permit checklist, fee schedule and current review timeline.

2.  Check erosion, grading and stormwater permits

    Clearing and grading can need erosion control plans and construction stormwater permit coverage, depending on how much ground is disturbed.

    Ask  
    The county or city engineer and the state environmental agency.

    Request  
    Written answers on which permits apply to the planned disturbance.

3.  Check tree, historic and community review rules

    Tree ordinances, historic overlays and association design review can each add an approval step.

    Ask  
    Planning office and any association.

    Request  
    The rules and application steps for each.

## Build and close out

1.  Verify the contractor and the contract

    A licensed, insured contractor and a written contract protect your schedule and your money.

    Ask  
    The state contractor licensing board and your insurance agent.

    Request  
    License and insurance proof, a written contract with scope, price, schedule and payment terms, and lien waivers at each payment.

2.  Arrange builder’s risk insurance

    A homeowner policy often does not cover a house under construction.

    Ask  
    An insurance agent.

    Request  
    A written builder’s risk quote.

3.  Schedule the inspections and keep the records

    Each stage may need an inspection before the next one starts. For a septic system in Tennessee, the installer schedules a final inspection before it is covered.

    Ask  
    The building department and, for septic, the state environmental office.

    Request  
    Inspection approvals, a certificate of completion for septic, the certificate of occupancy and an as-built survey if required.

    [Source: Tennessee Department of Environment and Conservation, Subsurface Sewage Disposal System (SSDS) FAQ](https://www.tn.gov/environment/permits/water/septic-systems-permits/ssp/ssds-faqs.html)

## How should you use this checklist?

- **Treat each “Ask” as a real person.** A licensed professional or an office decides each question. The checklist only tells you whom to ask and what to request.
- **Get answers in writing.** A letter, a permit, a report or a recorded document is evidence. A phone answer is not.
- **Read the public-source readings first.** Run the [address lookup](https://abodeintlrealty.com/property-research/lookup/) to see flood zone, wetlands, soil, elevation, slope, drainage and land cover for a site. Each reading is context at one point, not a determination.
- **Run the numbers.** The [construction budget worksheet](https://abodeintlrealty.com/tools/construction-budget-worksheet/) adds up the costs from figures you type.
- **Lay out the schedule.** The [build timeline planner](https://abodeintlrealty.com/tools/build-timeline-planner/) arranges phases, waits and overlaps from lengths you type. The [county offices finder](https://abodeintlrealty.com/tools/county-offices-finder/) names which office to ask in your county.
- **Rules change.** Sources were read October 18, 2026. Confirm the current rule with the named office or your attorney.

More checklists are on the [planning tools page](https://abodeintlrealty.com/tools/).

## Builder site checklist: frequently asked questions

Can this checklist tell me whether a site is buildable?

No. Zoning, soils, flood zone, wetlands and utilities each need an answer from the office or professional who decides them. The checklist lists whom to ask.

Why do septic questions come so early?

Where there is no sewer, soil decides whether and where a septic system fits. In Tennessee the state environmental department can take up to 45 days to process a complete application, so the site evaluation is worth ordering early.

Is anything I tick saved or sent to ABODE?

No. The list runs in your browser. Ticks and choices are not saved, sent or logged. Use Copy as text or Print to keep your own copy.

## Sources and notes

1.  [Tennessee Department of Environment and Conservation, Subsurface Sewage Disposal System (SSDS) FAQ](https://www.tn.gov/environment/permits/water/septic-systems-permits/ssp/ssds-faqs.html). Read October 18, 2026.
2.  [Florida Department of Health, Septic systems (septic permitting moved to the Department of Environmental Protection in 16 counties on January 2, 2025)](https://www.floridahealth.gov/environmental-health/septic-systems/). Read October 18, 2026.
3.  [FEMA Map Service Center](https://msc.fema.gov/portal/home). Read October 18, 2026.